Call 760-741-3570

ERTC Medical Office


Escondido, CA

Phase I includes Design & Construction of New 72,000 sf Medical/Rehab Building. Phase II projected to include 2 additional buildings

Masson & Associates, Inc. is providing schematic design, design development, construction drawings and construction administration for this design-build project. Civil work includes preparation of a preliminary grading and drainage plan, stormwater management, parking lot and drive isle design, and hardscape improvement design including ADA accessible path design. Masson is also responsible for preparation of onsite utility plans including: sewer, water, fire and storm drain improvements. Masson’s in-house survey crews provided the topographic field survey for design. Masson is working with Richard Yen & Associates & Planner, Inc. on this Design-Build Project.
Share by: